Construction Of Two Cogeneration Systems At The Jankowice Chp Plant With A Capacity Of Approximately 2 Mwe And Approximately 2 Mwt Each, Together With The Accompanying Infrastructure, Using Gas From Methane Drainage From The Row Ruch Jankowice Coal Mine.

Polska Grupa Gornicza S.A. Poland has Released a tender for Construction Of Two Cogeneration Systems At The Jankowice Chp Plant With A Capacity Of Approximately 2 Mwe And Approximately 2 Mwt Each, Together With The Accompanying Infrastructure, Using Gas From Methane Drainage From The Row Ruch Jankowice Coal Mine. in Energy, Power and Electrical. The tender was released on Dec 11, 2024.

Country - Poland

Summary - Construction Of Two Cogeneration Systems At The Jankowice Chp Plant With A Capacity Of Approximately 2 Mwe And Approximately 2 Mwt Each, Together With The Accompanying Infrastructure, Using Gas From Methane Drainage From The Row Ruch Jankowice Coal Mine.

Deadline - login to view

ET reference number - 99515136

Product classification - Generating sets

Organization Details:

  Address - Poland

  Contact details - 565656565

  Tender notice no. - 76454545

  ET Ref Id - 99515136

  Document Type - Tender Notices

Notice Details and Documents:

Description - Description: The subject of the order is the implementation of the turnkey investment task entitled: "Installation of 2 cogeneration systems in EC Jankowice with a capacity of approximately 2 MWe and approximately 2 MWt each, together with the accomp anying infrastructure for gas from methane drainage from KWK ROW Ruch Jankowice". The aim of the investment project is to utilize methane from methane drainage from KWK ROW Ruch Jankowice for the production of electricity and heat. As part of the above task, it is planned to install 2 cogeneration units in a container housing based on gas engines with a capacity of approximately 2.0 MWe and approximately 2.0 MWt each. The installation of the unit

Et Ref Id - 99515136

Deadline - Nov 30, -0001

Share

Similar Tenders :