Upgrading Of Solar Power At Project Office From 10Kwv To 100Kwv. Six (3) Lithium Battery 25Kwh/48 Each.

The World Bank Nigeria has Released a tender for Upgrading Of Solar Power At Project Office From 10Kwv To 100Kwv. Six (3) Lithium Battery 25Kwh/48 Each. in Energy, Power and Electrical. The tender was released on Nov 25, 2024.

Country - Nigeria

Summary - Upgrading Of Solar Power At Project Office From 10Kwv To 100Kwv. Six (3) Lithium Battery 25Kwh/48 Each.

Deadline - login to view

ET reference number - 98336472

Product classification - Electrical machinery, apparatus, equipment and consumables; lighting

Organization Details:

  Address - Nigeria

  Contact details - 565656565

  Tender notice no. - 76454545

  ET Ref Id - 98336472

  Document Type - Tender Notices

Notice Details and Documents:

Description - Description: UPGRADING OF SOLAR POWER AT PROJECT OFFICE FROM 10KWV TO 100KWVlocal title:: Upgrading of Solar Power at Project office from 10kwv to 100kwv. Six (3) Lithium battery 25kwh/48 each.Project Name: : Livestock Productivity and Resilience Sup port Project - P160865local description: : UPGRADING OF SOLAR POWER AT PROJECT OFFICE FROM 10KWV TO 100KWV lot_details: 1: Upgrading of Solar Power at Project office from 10kwv to 100kwv. Six (3) Lithium battery 25kwh/48 each.

Et Ref Id - 98336472

Deadline - Nov 30, -0001

Share

Similar Tenders :